Skip to content
- Home
- Management
- Vendor Validation Procedure for an automatic a powder coat plant
- Initial
response to the enquiry
- Cooperation
during technical negotiations
- Commitment
to technical meetings and discussions
- Technical
representation
- Managerial
competency of the sales person
- Support
to technical visits for vendor evaluation
- Responses
to technical queries
- Infrastructure
- Design
team
- Conveyor
loop
- Space
occupied by powder coat curing oven
- Tanks
and tunnels fabrication
- Provision
for under volume production
- Heat
exchanger
- Oven
type
- Conveyor
system
- Conveyor
length
- Conveyor
speed
- Conveyor
guard
- Maximum
height of the conveyor
- Minimum
height of the conveyor
- Conveyor
pitch
- Water
flow calculation and management
- System
compatibility with spray type Nanocoating pretreatment
- Selection
of appropriate nozzles for spray nano pretreatment
- Compressors
- Gas
burner
- Gas
alarming system monitor
- Enclosure
in with forced cooling after water dry oven
- Enclosure
for powder coat booth with temperature and air regulation